Კაშხალი

1927

Კაშხალი

0 0 

Gruzja Gruzja > Mtskheta-Mtianeti > Mtskheta Municipality > Karsani
Zemo Avchala HPP (Zahesi) - hydroelectric power station on the Kura River in Georgia. Included in the Kura cascade. Construction began on the electrification plan in 1923, the first hydroelectric plant started up in 1927. At the station in 1927, it was installed one of the first monuments to Lenin the authorship of the sculptor ID Shadr, dismantled in 1991. In 1937 he was arrested and then shot the chief engineer of the plant Nikolay Agniashvili.V 2007 Zemo Avchala HPP was sold to the Government of Georgia with the auction. HPP equipment is outdated, in need of replacement and reconstruction.
Komentarze (0)


Zarejestruj się na lub zaloguj się aby komentować i przyczyniać się do rozwoju społeczności 

avatar

natela_choco
823 zdjęcia

სასტუმრო სასტუმრო კოჯორი, თბილისის მერია. New ბავშვთა სანატორიუმის შენობამთა მთაწმინდა, ფუნიკულიორის და სატელევიზიო კოშკიწყალტუბოს სანატორიუმ



Zdjęcia w pobliżu

სამშენებლო ზაჰესში. საიტი კაშხლისზემო ავჭალის ჰიდროელექტროსადგურის საქართველოშიკაშხლის ზემო ავჭალის ჰიდროელექტრო სადგურიზემო Avçalskaya GESმშენებლობა კაშხლის ზემო Avchyalovskoy ჰიდროელექტროსადგური თბილისში, მდინარე. Kypeმიხეილ კალინინის აქციაზე at გახსნას ზემო ავჭალის ჰიდროელექტროსადგურისლენინის ძეგლის ზემო ავჭალის ჰიდროელექტროსადგურისლენინის ძეგლი და ჯვრის მონასტერილენინის ძეგლის და ჯვრის მონასტრისსამშენებლო ზაჰესი-sky bridge

Zdjęcie opublikowane na stronie
 19/11/2020 12:48


© Nieznany
Wszystkie prawa zastrzeżone.

Zdjęcie użyte na warunkach "Fair Use".



Stare zdjęcia Karsani,Stare fotografie Karsani,Stare obrazy Karsani,Stare migawki z Karsani,Stare panoramiczne widoki na Karsani,Stare druki Karsani